SPECIALIZING IN FORCE ACCOUNT INVOICES

Force account is money you've already spent.

We prepare, verify and document IDOT extra work invoices so they clear the first time — and so the hours, rates and quantities you are owed are the hours, rates and quantities you get paid for.

THE PROBLEM

Why force account costs contractors money

1

It takes days you don't have

A single authorization can run 150+ pages, hand-assembled from stacks of paper daily reports, then re-keyed into a spreadsheet weeks after the crew went home.

2

It comes back

One payroll mismatch, one rate that moved mid-invoice, one quantity delivered but not used — and the whole package is red-lined. Payment slips by weeks, sometimes months.

3

The clock is already running

Article 109.04(b)(9) gives you 60 days from the BC 635 to get the statement in. Late statements waive the demand entirely.

WHAT IT ACTUALLY COSTS
$9,334
STRUCK FROM ONE AUTHORIZATION

On one Illinois interstate authorization we reconciled, the resident engineer struck $9,334 — 3.3% of the invoice. Not one dollar of it was an arithmetic error.

Sixty-three labor hours were recorded on BC 635s signed by the State's own representative, but never tied to the certified payroll. Every shift that got cut ran past midnight. The review happened twenty months after the work — by then nobody could reconstruct a night shift from memory.

The wages themselves were only $3,713 of it. Fringe, the 35% labor markup, the payroll additives and the bond turned that into $9,334. On a force account invoice, every payroll error is multiplied about two and a half times.

WHAT WE DO

One connected system, run for you as a service

You send the data. We produce a submission-ready package.

A

Digital daily reports

The BC 635 filled once, on a tablet, at the jobsite. Crew and equipment from controlled lists, hours calculated, both signatures captured the day of the work. Nothing handwritten, nothing illegible.

B

The invoice builds itself

Field data flows straight into the force account invoice with the correct labor rates, fringes, Blue Book equipment rates and Article 109.04 markups. No re-keying, no transcription errors.

C

Checked before it's sent

Every hour reconciled to the certified payroll — including hours after midnight on the other calendar date. Every line traced to a signed BC 635. Delivered-versus-used quantities flagged.

D

Construction Memo 9 built in

Workers' compensation on a straight-time basis. Truck-driver wages out of the public liability base. Blue Book FHWA rates locked to the revision in effect on day one.

HOW IT WORKS

Three steps, starting with one invoice

1

Set up once

You send your crew roster, equipment list and rate documentation. We build the templates your projects run on from then on.

2

Run a pilot

Give us one authorization. We prepare it, or shadow-check the one you prepared, and show you line by line what we found.

3

Roll it out

Once you've seen an invoice clear without a red line on it, we take on the rest of your force account work.

WHY US

We build it the way the reviewer needs to see it

We know the review side

We know what gets a force account invoice struck, because we have taken real packages apart line by line and found it.

Grounded in the specification

Article 109.04 and IDOT Construction Memorandum 9, cited clause by clause — not an interpretation of them.

Proven on real invoices

Complete authorizations reconciled to the penny against the contractor's own submitted figures — not a demo.

Built to travel

Force account and extra work are federal vocabulary. What we build for your IDOT work carries to other agencies.

START WITH ONE AUTHORIZATION

Send us the last one that came back marked up.

We'll show you exactly what a reviewer would find — before a reviewer finds it.

Or email sales@forceaccountsolutions.com. We reply to every enquiry.